Page 3
Introduction General scope of services Tests Medium-Voltage Drive SINAMICS GL150 Type 6SL3855 Reference Manual This documentation pertains to GL150 wassergekühlt F03 F70 F76 F79 F98 E11 Edition 02/2019...
Page 4
Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
● Tests that are offered as standard Note If the scope of testing and inspection cannot fulfill all customer requirements, please consult your Siemens sales advisor at head office. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
5. Preparation of test documentation for the customer. The test documentation is created before or after the customer leaves depending on the scope of testing and the time schedule. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
Page 10
PD LD scope of supply. This also applies to components ordered from other Siemens' Groups. The technical data for these components is required at the latest eight weeks before the start of the acceptance test, e.g.: ●...
General scope of services 2.1 Routine test Routine test During production, the drive is subject to an internal routine test. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
Siemens directives within the scope of quality assurance. The function tests are performed and documented in the Siemens test field by internal test field personnel. For the function test, the drive is in the test mode with restricted monitoring functions.
3.2 certificate. See also Insulation test (Page 33) The insulation test is performed on a separate acceptance day prior to the function test. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
● Additional interfaces The test is confirmed in a 3.1 certificate – or in the case that the customer has ordered the acceptance test, in a 3.2 certificate. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
Page 16
General scope of services 2.5 Interface test SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
Tests The tests that have been expressly ordered for the drive with serial number 12345670001001 are listed in the following. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
– Fittings and rubber seals in the doors and between the cabinet units – Cable entries – Openings for water pipes, if available – Additional components, if available SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
– Are the cables routed according to the circuit diagram? Result The inspection is passed if the cable installation does not exhibit any deficiencies and matches the information in the circuit diagram. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
The drive dimensions are measured. The basis for the visual inspection is the order-specific dimension drawing. Test procedure 1. The external dimensions, length, width and height of the drive are measured. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
Page 21
Tests 3.1 Visual inspection Result The test is passed if the dimensions match with what is specified in the dimension drawing. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
The test is passed if the excitation unit can be operated without errors. 3.2.3 Auxiliary voltages Fundamentals Tests are performed according to DIN EN 60146-1. The auxiliary voltages are visually checked using indicator lights or using a voltmeter. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
3. A miniature circuit breaker of the auxiliary power supply is opened. The auxiliary power supply continues. An alarm is displayed on the test station computer. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
3. The DC-link pulsing frequency is set to 2 Hz. The current electrical values are displayed on the test station computer. Result The test is passed if alternating current is flowing at the drive output. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
The test is passed if the appropriate message is displayed on the test station computer. 3.2.10 Overcurrent limit Fundamentals The test reveals whether the drive switches off when the overcurrent limit is reached. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
The test is passed if the drive responds as described above. 3.2.12 Failure of actual value acquisition Fundamentals The test reveals whether the drive switches off when actual value acquisition is defective. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
2. The cable at digital input DI6 of the Power Stack Adapter is interrupted. If installed, miniature circuit breaker MCB-F12 is opened. The alarm is displayed on the test station computer. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
The test is passed if the drive responds as described. 3.2.17 PROFIBUS connection with the excitation unit Fundamentals The PROFIBUS connection between the excitation unit and the drive is tested. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
3. The button is pressed. Result The test is passed if the drive is shut down and the appropriate message is displayed on the test station computer. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
4. After a total of 60 min, pressure p is measured. Figure 3-1 Procedure for the pressure test 5. The pressure drop is calculated from measured values: Δp = p SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
1. The cooling unit is switched on. The auxiliary voltage is present. 2. The calculated flow is checked. It is permissible that the flow deviates by ±5 % from the calculated value. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
2. Moisture/water is applied to one leakage sensor. 3. A message is displayed on the test station computer. Result The test is passed if a message is displayed on the test station computer. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
5. The test is repeated with 80% test voltage. Result The test is passed if the test instrument is not switched off (tripped) during the test as a result of flashover. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
4. The circuits are tested with respect to one another and with respect to the PE protective conductor at the electrical cabinet. Result The test is passed if the insulation resistances lie within the tolerance specified by the standard. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
Test procedure 1. The auxiliary voltage is present. 2. The connection is established via the test station computer. 3. The signals are simulated. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
3. The customer establishes the software connection to the drive. 4. The customer parameterizes and tests the communication of selected interfaces. Result The interface test has been completed after four hours. SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
28 Ready to start condition, 22 Redundant 230 V or 24 V auxiliary voltage supply, 23 Safety shutdown, 29 Temperature monitoring in the control cabinet, 23 SINAMICS GL150 6SL3855 F03 F70 F76 F79 F98 E11 Reference Manual Rev.201902141423 GL150 wassergekühlt...
Page 40
8888888888 000088 01 EN 01 Further Information www.siemens.com/drives Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY *888888888800008801EN01* 888888888800008801EN01...
Page 41
Process Industries and Drives Department PD LD P MF-NMA EN Siemens AG, PD LD P MF-NMA EN, Postfach 47 43, 90025 Nürnberg Tel. +49 (911) 433-6422 +49 (911) 433-6921 Email motoren.doku.aud@internal.siemens.co Our ref. 8888888888000088 Date 14.02.2019 Documentation for 6SL3855 Your order no. - 000010...
Page 43
SINAMICS GL150 6SL3855 GL150 wassergekühlt F03 F70 F76 F79 F98 E11 Tests carried out on drives Spine label for binder 162 mm (120 g/m2) SINAMICS GL150 6SL3855 GL150 wassergekühlt F03 F70 F76 F79 F98 E11 Tests carried out on drives...