Care and Maintenance
Item
Measurement Accuracy
Checks
Probe/Phantom Checks
Check gain changes, vary the focus and check
reaction on screen.
NOTE! The use of a Phantom is not required during
Preventive Maintenance. Customer may use it as part
of their Quality Assurance Program tests.
Functional Checks of all
probes
Section 10.4.2 on
page 10-5
10.3 Tools required
10.3.1 Special Tools, Supplies and Equipment used for Maintenance
Electrical leakage testing may be accomplished with any calibrated Electrical Safety Analyzer tool compliant
Note
with AAMI/ESI 1993 or IEC 60601 or AS/NZS 3551 or IEC 62353 or other relevant national regulation.
Table 10-2 overview of supplies and equipment used for maintenance
Tools
Digital Volt Meter (DVM)
Anti Static Kit
Anti Static Vacuum Cleaner
QIQ Phantom
CD-RW Media
DVD+RW Disc Media blank
B/W Printer Cleaning Sheet
Color Printer Cleaning Sheet
Disposable Cloves
10-4
Service at indicated Time
minimum 5% accuracy, 3.5 digit and 200 Ohm range required
including anti-static mat, wrist strap, cables and conductive ground cord
•
NOTE! The use of a Phantom is not required during Preventive Maintenance. Customer
may use it as part of their Quality Assurance Program tests.
(minimum quad speed)
blank 4,7GB DVD+RW disc
see printer user manual for requirements
see printer user manual for requirements
•
D W M A
•
Also after corrective maintenance or
as required by your facilities QA
program.
•
Also after corrective maintenance or
as required by your facilities QA
program.
•
Also after corrective maintenance or
as required by your facilities QA
program.
Comments
Voluson E-Series Service Manual
Notes
5539550APB Revision 6