Facility Needs; Purchaser Responsibilities - GE Voluson E Series Service Manual

Hide thumbs Also See for Voluson E Series:
Table of Contents

Advertisement

Site Preparation

2.2 Facility Needs

2.2.1 Purchaser Responsibilities

The work and materials needed to prepare the site is the responsibility of the purchaser. Delay, confusion,
and waste of manpower can be avoided by completing pre-installation work before delivery.
Use the Pre-installation checklist (provided in
Action
Schedule at least 3 hours for installation of the system.
Notify installation team of the existence of any variances from the basic installation.
Make sure system and probes have been subject to acclimation period.
Environmental cooling is sufficient.
Lighting is adjustable to adapt to varying operational conditions of the system.
Electrical facilities meet system requirements.
EMI precautions have been taken and all possible sources of interference have been removed.
Mandatory site requirements have been met.
If a network is used, IP address has been set for the system and a dedicated network outlet is available.
Purchaser responsibility includes:
Procuring the materials required.
Completing the preparations before delivery of the ultrasound system.
Paying the costs for any alterations and modifications not specifically provided in the sales contract.
All electrical installations that are preliminary to the positioning of the equipment at the site prepared for the
Note
equipment must be performed by licensed electrical contractors. Other connections between pieces of
electrical equipment, calibrations, and testing must also be performed by qualified personnel. The products
involved (and the accompanying electrical installations) are highly sophisticated and special engineering
competence is required. All electrical work on these products must comply with the requirements of
applicable electrical codes. The purchaser of GE equipment must only utilize qualified personnel to perform
electrical servicing on the equipment.
The desire to use a non–listed or customer provided product or to place an approved product further from the
system than the interface kit allows presents challenges to the installation team. To avoid delays during
installation, such variances should be made known to the individuals or group performing the installation at
the earliest possible date (preferably prior to the purchase).
The ultrasound suite must be clean prior to delivery of the machine. Carpet is not recommended because it
collects dust and creates static. Potential sources of EMI (electromagnetic interference) should also be
investigated before delivery. Dirt, static, and EMI can negatively impact system reliability.
2-6
Table 2-5 Voluson E-Series pre-installation checklist
Table 2-5
) to verify that all needed steps have been taken.
Yes
No
Voluson E-Series Service Manual
5539550APB Revision 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Voluson e6Voluson e8Bt15Bt16Bt17Bt18

Table of Contents