Replacement Procedures
8.17 Replacing optional Peripherals / How to mount Peripherals at a later date
Normally auxiliary devices and peripherals come pre-installed with the Voluson E-Series system.
Note
Manpower
One person, 30 - 60 minutes (depending on peripherals)
Tools
slotted screwdriver
Preparations
Content in this section
8.17.1 Mounting/Replacing a Secondary "Patient" Monitor - - - - - - - - - - - - - - - - - - - - - - 8-29
Caution
A Secondary "Patient" Monitor MUST NEVER be connected to the Voluson E-Series systems mains supply
directly! Always connect it to an appropriate Isolation Transformer (see
Warning
After each installation, the leakage currents have to be measured according to IEC 60601-1, IEC 62353 or
other relevant standard.
8-28
Section 9.10.3 on page 9-42
Voluson E-Series Service Manual
5539550APB Revision 6
).