Table 18: Site Preparation Checklist
Item or Task
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Desk or Wall
Verify that the wall meets the minimum
requirements for the installation of the
switch.
Verify that there is appropriate clearance
in your selected location.
Cables
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
configuration.
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
General Safety Guidelines and Warnings
General Site Guidelines
(Continued)
For More Information
"Clearance Requirements for Airflow and Hardware
Maintenance for EX2300 Switches" on page 67
"Requirements for Mounting an EX2300 Switch On
or Under a Desk or Other Level Surface or On a
Wall" on page 66
"Clearance Requirements for Airflow and Hardware
Maintenance for EX2300 Switches" on page 67
54