Disassembly/Reassembly Process; Air Baffle Replacement - Inspur ON5263M5 User Manual

Inspur server
Table of Contents

Advertisement

Do the following prior to starting any the installation or maintenance procedure.
1. Shut-down the server.
2. Remove all cables from the system.
3. Remove the node server from the rack. For more information on removing the node
server, see
Open Rack Server Installation
4.4

Disassembly/Reassembly Process

NOTE:
During installation or removal of any hardware, always ensure all data is
backed up properly.
Disconnect any cables from the server.
Disconnect the server and all attached devices from their electrical outlets.
Item appearance may be different on actual models.

4.4.1 Air Baffle Replacement

CAUTION:
For proper cooling, do not operate the server without the air baffle or fan
installed.
1. Press the locking tab on both sides of the server simultaneously.
Getting Started
Guide.
12