Getting Started; Package Contents; Power On/Off; Pre-Disassembly Instructions - Inspur ON5263M5 User Manual

Inspur server
Table of Contents

Advertisement

4. Getting Started

4.1

Package Contents

Unpack the server shipping carton and locate the materials and documentation necessary
for installing the server. All the rack installation guide necessary for installing the server into
the rack is included with the rack or the server.
The contents of the server shipping carton include:
Cubby
Compute Sled (containing commodities)
4.2

Power On/Off

To power on and off the server, press the Power button.
To complete shut-down the server, press the Power button and disconnect the power cord
from the server.
WARNING:
To reduce the risk of personal injury, electric shock, or damage to the
equipment, remove the power cord to disconnect power from the server. The Power
button does not shut off the system power completely. Portions of the power supply
and some internal circuitry remain active until the AC power is removed.
4.3

Pre-disassembly Instructions

Read the installation instructions for all the hardware operations before disassembling or
re-assembling the components. All prerequisites must be completed prior to starting the
installation or maintenance procedure.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives
and the internal system components to cool down before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server
before beginning any installation procedure. Improper grounding can cause
electrostatic discharge.
Getting Started
11

Advertisement

Table of Contents
loading

Table of Contents