Regular Check; Prepare For Function Test - Pilz PSENvip RL D P Set Operating Manual

Table of Contents

Advertisement

Commissioning
7.5.1.3

Regular check

Safeguards must undergo a regular function test:
}
After switching on the supply voltage for the first press stroke
}
At least every 30 hours
Depending on the level of use, safety devices and safety measures on the press brake
must be checked at least once a year by an appointed expert (competent person) to ensure
they are in a safe condition. The result of these tests must be entered in the inspection
book or in the machine file. Any serious non-conformances must be rectified before the
press brake is returned to operation.
7.5.1.4

Prepare for function test

Proceed as follows:
}
During initial commissioning the press brake is fully configured with the upper tool (max-
imum weight).
}
Transmitter and receiver are correctly aligned (see "Initial commissioning").
}
The press brake is at top dead centre.
}
Transmitter and receiver are ready for operation.
}
Standard protected field mode is selected.
Operating Manual PSENvip RL D P Set
1001641-EN-09
INFORMATION
The check following modifications may only be carried out by qualified per-
sonnel.
NOTICE
The safety-related control system must request these regular inspections of
the safeguard via a user program.
INFORMATION
Trained operators must be used for the daily check.
INFORMATION
The annual inspection may only be carried out by qualified personnel.
| 83