MB Connect Line mbNET.rokey RKH 210 Manual page 270

Hide thumbs Also See for mbNET.rokey RKH 210:
Table of Contents

Advertisement

Information
• Serial number of the mbEDGE card
• License Type
Here you can see the license type of your mbEDGE card: mbEDGE.start or mbEDGE.advanced.
Docker
• Service
Activate your mbEDGE license here.
• Daemon
LED symbol indicates whether the Docker daemon is active (green symbol).
Docker Management
• Service
Activate Docker Management here.
• Link to User Interface
The "Management" button takes you to the container management.
Flows and Dashboard
• Service
Here you activate access to your flows and your dashboard.
• Use HTTP instead of HTTPS (only mbEDGE)
Here you can switch from HTTPS to an unencrypted connection (HTTP).
The unencrypted connection only applies to Flows and Dashboard and not to access to the mbNET
GUI.
• Link to Flows(Node-Red)
The "Flows" button takes you to the Node-Red flows
• Link zu Dashboard(Node-Red)
The "Dashboard" button takes you to the Node-Red dashboard.
Backup and Delete flows
• Here you can save and / or delete the flows you have created.
Saved flows can be read in again via Node-Red.
Page 270 von 324 | V 7.2.0 - en | Aug 25
th
, 2022 |

Advertisement

Table of Contents
loading

Table of Contents