L-Acoustics K1 REFERENCE WST SYSTEM Rigging Procedures page 36

Hide thumbs Also See for K1 REFERENCE WST SYSTEM:
Table of Contents

Advertisement

K1
K1
K1
K1
reference wst
reference wst
reference wst
reference wst
RIGGING PROCEDURES
RIGGING PROCEDURES
RIGGING PROCEDURES
RIGGING PROCEDURES
VERSION 2.0
18. Remove the TOWER#1 from the rigging location.
19. Insert the four R-BLP in their shipping locations on the K1-BUMP main frame.
Note: These locations are located inside or outside the frame. The inner locations can help for shipping.
20. Lower the K1-BUMP until it is laid on the ground.
21. If necessary, remove the LA-RAK touring racks by following procedure [6.1.2] in the reversed sequence.
22. Remove the motor hooks from the K1-BUMP.
23. Set the K1-BUMP in shipping configuration by following procedure [6.1.1] in the reversed sequence.
K1_RM_EN_2-0
® ® ® ®
system
system
system
system
Figure 29: R-BLP shipping locations on the frame
w w w . l - a c o u s t i c s . c o m
Inner
Outer
shipping
shipping
locations
locations
34
34
34
34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reference wst system k1K1-bumpK1-deltaKara-downk1K1-chariotK1bump-flight

Table of Contents