6�8�- Measurement System; 6�9�- Maximum Demand Integration Period - Circutor CVM-E3-MINI-ITF Instruction Manual

Power analyzer
Table of Contents

Advertisement

6.8.- MEASUREMENT SYSTEM
The measurement system is selected on this screen.
Press the
of the screen.
The
4-3PhThree-phase network measurement with a 4-wire connection.
3-3PhThree-phase network measurement with a 3-wire connection
3-ArOnThree-phase network measurement with a 3-wire connection and transformers with
an ARON connection.
3-2Ph Two-phase network measurement with a 3-wire connection.
2-2Ph Single-phase network measurement, phase to phase, with a 2-wire connection.
2-1Ph Single-phase network measurement, phase to neutral, with a 2-wire connection.
(4)
Option not available for the models: CVM-E3-MINI-FLEX and CVM-E3-MINI-FLEX-WiEth.
To validate the value, press the
Press key
6.9.- MAXIMUM DEMAND INTEGRATION PERIOD
The maximum demand integration period is programmed in minutes on this screen.
Press the
of the screen.
Press the
When the desired value is shown on the screen, use the
cursor.
60
key for 3 seconds to enter the edit mode. The prog icon will flash on the left
key is used to browse the different options
(4)
to access the next programming step.
key for 3 seconds to enter the edit mode. The prog icon will flash on the left
key to modify the value of the flashing digit.
key for 3 seconds; the prog icon will stop flashing.
CVM-E3-MINI
and
keys to move the edit
Instruction Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CVM-E3-MINI-ITF and is the answer not in the manual?

Questions and answers

Table of Contents