Figure 31. Installing the Power Cord Retaining Clip
Note
The PWR250-80 and PWR1200 Power Supplies do not come with a
retaining clip.
8. To install a second power supply, repeat this procedure, starting with
step 3.
9. If you installed only one power supply in the switch, perform the
procedure in "Installing a Blank Power Supply Slot Cover" on page 96.
10. Do one of the following:
To install the switch on a table, go to Chapter 5, "Installing the
Switch on a Table" on page 99.
To install the switch in an equipment rack, refer to Chapter 6,
"Installing the Switch in an Equipment Rack" on page 103.
To install the switch on a wall, refer to Chapter 7, "Installing the
Switch on a Wall" on page 109.
To install the switch in the RKMT-SL01 sliding rack, go to Appendix
B, "Installing the Switch in the RKMT-SL01 Sliding Rack" on page
177.