Installing the Outer Rails on the Equipment Rack

188
To install the outer rails to the equipment rack, perform the following
procedure.
1. Locate the FRONT and REAR labels on the sides of the rails. You
have to install the rails with the FRONT labels at the front of the
equipment rack and the REAR Labels at the back. Refer to Figure 62.
Figure 62. FRONT and REAR Labels on the Outer Rails
2. Attach the outer rails to the equipment rack using the supplied screws.
Use four screws per rail. Refer to Figure 63 on page 189. Installing the
switch can be easier if you leave the screws slightly loosened now and
fully tightened them after the switch is installed.
Warning
Built-in stoppers prevent the outer rails from extending beyond their
maximum length of 960 mm (37.8 in). Do not force the rails beyond
the maximum length. Otherwise, the brackets will be weakened, and
the switch may fall from the rack and be damaged.
Warning
Verify that the front and rear of both outer rails are attached at the
same distance from the floor, otherwise the switch may fall from the
rack.
E66
3. Go to "Installing the Extension Brackets on the Inner Rails" on
page 190.