Figure 66: Inserting An Inner Rail Into An Outer Rail; Figure 67: Example Of Positioning The Inner Rail; Figure 68: Measuring For The Extension Brackets - Allied Telesis x530DP Series Installation Manual

Stackable gigabit layer 3+ ethernet switches alliedware plus v5.5.1-2.1
Table of Contents

Advertisement

Figure 66. Inserting an Inner Rail into an Outer Rail
2. Position the inner rail at the planned location for the front panel of
switch in the sliding rack. Refer to Figure 67.
Location of Front
Panel of Switch
Figure 67. Example of Positioning the Inner Rail
3. Measure the distance from the front of the equipment rack to the front
of the inner rail. This will be the approximate length of the extension
brackets. Refer to Figure 68.
Figure 68. Measuring for the Extension Brackets
x530DP Series Installation Guide for Virtual Chassis Stacking
191

Advertisement

Table of Contents
loading

This manual is also suitable for:

X530dp-28ghxmX530dp-52ghxm

Table of Contents