Wiring Loom Handle Kit Replacement - Minelab MF5 Service Manual

Metal mine detector
Hide thumbs Also See for MF5:
Table of Contents

Advertisement

MF5 Service Manual
________________________________________________________________________________________________________________
b.
Required Tools:
Spanner 13mm
c.
Open the detector body and remove the Main PCB as described in Section
Detector Chassis
and
Remove the Main
Disconnect the Wiring Loom Earset from the PCB.
Unscrew the Nut Earset Connector and remove the Nut and the Dust Cap.
Dust Cap
Nut 13mm
d.
The Wiring Loom Earset can now be removed and replaced as required. The Wiring Loom
Earset is connected to the detector following the reverse order of the removal.

3.9.4 Wiring Loom Handle Kit Replacement

a.
The Wiring Loom Handle Kit is available as a spare part kit, the following table shows the
major parts of Wiring Loom Handle kit.
Item
Part Number
1
3004-0295
2
30-29011-519
3
9511-0281
4
30-05214-003
PCB. Once completed:
Figure 96: Earset connector
Figure 97: Wiring Loom Handle parts
Description
Wiring Loom Handle Kit
O-Ring BS012
Wiring Loom Handle Socket
Circlip External 7mm
Table 15: Wiring Loom Handle Kit
76
Open the
Qty
1
1
1
1

Advertisement

Table of Contents
loading

Table of Contents