Minelab MF5 Service Manual page 24

Metal mine detector
Hide thumbs Also See for MF5:
Table of Contents

Advertisement

MF5 Service Manual
________________________________________________________________________________________________________________
Starting with the two (2) long (M4x35mm) screws fit the four (4) remaining screws into the
right side of the detector.
Tighten all eight (8) screws.
Identify the four (4) Torx (star) screws and check they all have O-rings fitted. Insert the
four (4) Torx screws into the right side of the detector. The Torx screw positions have a
Torx symbol next to their screw holes. Insert the three long screws first.
Check the detector assembly and test all moving parts.
Figure 22: Insert four screws
Figure 23: Insert four (4) Torx screws in location with star
Torx (Star) Screw with O ring
24

Advertisement

Table of Contents
loading

Table of Contents