Minelab MF5 Service Manual page 36

Metal mine detector
Hide thumbs Also See for MF5:
Table of Contents

Advertisement

MF5 Service Manual
________________________________________________________________________________________________________________
Connect the Coil Receiver Connector to the Main PCB. Screw the Coil Receiver Connector
to the Main PCB using the M2x5mm screw (31-22005-980). Apply a small amount of
threadlocker (Loctite 222) to the thread of the M2x5mm screw
Coil Transmitter
connector
Connect the Wiring Loom Earset to the Main PCB.
Connect the Wiring Loom Handle to the Main PCB.
Connect the Vibration Motor to the Main PCB.
Connect the Connector Coil Loom to the Main PCB.
Figure 40: Connect Coil Transmitter and Coil Receiver.
Figure 41: Connect Earset Loom.
Coil Receiver
connector
36

Advertisement

Table of Contents
loading

Table of Contents