Connect The Coil - Minelab MF5 Service Manual

Metal mine detector
Hide thumbs Also See for MF5:
Table of Contents

Advertisement

_________________________________________________________________________________________________________________
Insert the Screw (Nylon M6x27) into the Pivot Coil Yoke and then insert the Thumb Screw
(Screw Thumb Nylon 1/4BSW). Tighten both screws until the movement of the coil starts
to become firm.
The Screw Thumb Nylon 1/4BSW will adjust the friction of the coil tilt. The Screw Thumb Nylon
1/4BSW must be tight enough to stop the coil from moving position whilst being used. The Screw
(Nylon M6x27) will adjust the friction of the coil rotation (270 deg).
c.
Attach the coil to the shaft then fit onto the detector as described in Section
Coil.
d.
Complete the mechanical and function testing of the metal detector (described in this
manual) before returning the MF5 to operations.

3.4.5 Connect the Coil

a.
Required Tools:
Hex key driver (allen key) 3mm
Flat tip screw driver
b.
Open the detector chassis as described in section
completed. Remove the Shaft and Coil from the detector as described in section
Shafts
Figure 62: Insert Screws.
NOTE
49
MF5 Service Manual
Open the Detector
Chassis. Once
Connect the
Remove the

Advertisement

Table of Contents
loading

Table of Contents