Minelab MF5 Service Manual page 37

Metal mine detector
Hide thumbs Also See for MF5:
Table of Contents

Advertisement

MF5 Service Manual
_________________________________________________________________________________________________________________
Wiring
Loom
Handle
Connector Coil Loom
Figure 42: Connect Handle, Vibration Motor and Connector Coil Loom.
Connect the Battery Connector to the Main PCB.
Make sure all connectors are firmly in place and all wires and cables are positioned so that
they will not cause obstruction or get damaged when the two halves of the main body are
fitted together.
Having completed the previous steps the Main PCB is now installed and connected into the
MF5. To complete the assembly of the detector refer to section
Figure 43: Connect the Battery Connector.
37
Vibration Motor
Connector to
Vibration Motor
Closing the Detector
Body.

Advertisement

Table of Contents
loading

Table of Contents