Introduction To Maintenance - Agilent Technologies Infinity II 1290 User Manual

Flexible pump
Hide thumbs Also See for Infinity II 1290:
Table of Contents

Advertisement

Introduction to Maintenance

Figure 10
Agilent 1290 Infinity II Flexible Pump. These parts can be accessed from
the front (simple repairs) and don't require to remove the pump from the
system stack.
Figure 10
Recommended Interval for Preventive Maintenance
The recommended interval for preventive maintenance is:
• 100 L or 1 year (whichever comes first).
This recommendation is valid for LC instruments on which "typical"
applications are running.
A "typical" application can be characterized as follows:
• pressure range 100 – 800 bar,
• flow rates 0.5 – 3.5 mL/min,
• typical solvents used in reversed phase LC.
Agilent 1290 Infinity II Flexible Pump User Manual
on page 81 shows the main user- accessible assemblies of the
Overview of maintenance parts
Maintenance

Introduction to Maintenance

7
81

Advertisement

Table of Contents
loading

This manual is also suitable for:

G7104a

Table of Contents