7
Maintenance
Pump Head Procedures
3
Insert the new inlet weaver to the inlet valve (1, 2). Fix
the weaver with the plastic screw to the inlet valve (3).
5
Connect the capillary from the outlet filter adapter on the
secondary pump head to the pressure sensor.
Next Steps:
7
Close the doors.
8
Perform a Pump Leak Rate Test and a System Pressure Test.
132
4
Reconnect solvent tubes for channels A-D from the
MCGV to the degasser outlets.
6
Connect the seal wash tubes.
Agilent 1290 Infinity II Flexible Pump User Manual