Chapter 3
Installation
Section 3-1

Overview

3-1-1

Purpose of Chapter 3

This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit, probes,
and external peripherals for electrical safety are included in this procedure. Also included in this section
are guidelines for transporting the unit to a new site.
Table 3-1 Contents in Chapter 3
Section
3-1
3-2
3-3
3-4
3-5
3-1-2

Average Installation Time

Table 3-2 Average Installation Time
Unpacking the scanner
Scanner wo/options
DICOM Option
InSite Option
The LOGIQ™ 7 has been designed to be installed and checked out by an experienced service
technician in approximately four hours. LOGIQ™ 7 consoles with optional equipment may take slightly
longer.
14
Overview
Receiving and Unpacking the Equipment
Preparing for Installation
Completing the Installation
Installation Paperwork
Description
Average Installation Time
Section 3-1 - Overview
Description
0.5 hour
0.5 hour
Dependant on the configuration that is required
0.5 hour
Dependant on the amount of configuration
0.5 hour
LOGIQ™ 7 S
M
ERVICE
ANUAL
Page Number
3-1
3-3
3-10
3-11
3-18