Software Loading Procedures For Bt09 (R8.X.x Or Later); Parts Required; Time Required - GE LOGIQ 7 Service Manual

Hide thumbs Also See for LOGIQ 7:
Table of Contents

Advertisement

GE H
EALTHCARE
D
2286865, R
IRECTION
EVISION
Section 8-2

Software Loading Procedures for BT09 (R8.x.x or later)

This software can be installed for the system with software version R8.x.x.
CAUTION
8-2-1
General
This describes software loading procedures for BT09 System with BEP4 only. For the consoles
upgraded BT09 systems (contains BEP3 inside), follow procedure in Section 8-7 Software Loading
Procedures (R7.5.x or later).
Also, do not attempt to apply this procedure if you are upgrading older BTs to BT09/R8.x.x.
ILoading R8.x.x application software procedures requires basically C drives to be ghosted. In
CAUTION
this case, patient image data, preset parameters, and customer data will be kept. However , in
case full ghost will be required, you MUST back up before starting this procedure as follows.
For customer data safe, we recommend you to back up even for the C ghost only.
NOTE:
Be sure no images are in the clipboard or opened exams before loading base image software.
NOTE:
Before loading base image software, if you are troubleshooting loss of image or patient data,
review troubleshooting to collect information for future analysis.
8-2-2

Parts Required

-
-
8-2-3

Time Required

Approximately 1 hour
Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later)
14
LOGIQ 7 R8.x.x Application CD
LOGIQ7 Ghost DVD for BECOMP4: 5305206-x
LOGIQ™ 7 S
M
ERVICE
ANUAL
8-3

Advertisement

Table of Contents
loading

Table of Contents