GE LOGIQ 7 Service Manual page 232

Hide thumbs Also See for LOGIQ 7:
Table of Contents

Advertisement

GE H
EALTHCARE
D
2286865, R
IRECTION
EVISION
8-2-8-5
TCP/IP Filter Setup (cont'd)
8.) Verify that the proper TCP port numbers are entered in TCP Ports box, then click OK buttons for all
opened window to complete the TCP/IP Filter Setup.
9.) The following dialog box appears. Click No to proceed the other settings. (After completion of all
system checks, the system is shut down.)
In case the last dialog box to restart the computer does NOT appear, check the TCP/IP Filter setup
NOTICE
again.
Connectivity check will be performed in 8-2-10 System Settings.
8-26
Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later)
14
Figure 8-82 TCP/IP Filter Setup
Figure 8-83 No
LOGIQ™ 7 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents