Receiving And Unpacking The Equipment; Unpacking Procedures - GE LOGIQ 7 Service Manual

Hide thumbs Also See for LOGIQ 7:
Table of Contents

Advertisement

GE H
EALTHCARE
D
2286865, R
IRECTION
EVISION
Section 3-2

Receiving and Unpacking the Equipment

When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
Example shown:
LOGIQ 7 system

Unpacking Procedures:

1.) Cut the two Metal Bands.
2.) Lift the Cap up and off.
3.) Remove the six (6) Plastic Joints from the Outer Sleeves.
4.) Remove the Outer Sleeves.
5.) Remove the Monitor Sleeve.
6.) Remove the Box for Peripherals.
7.) Remove the Front and Rear Cushions.
8.) Slide out and set up the Slope.
9.) Unlock the brakes by stepping down on the brake pedal in front, then carefully roll the LOGIQ™
14
Outer Sleeve
Monitor Sleeve
For CRT
Box for
Peripherals
Front Cushion
Slope
Skid
Figure 3-1 Unpacking Procedures
7 rear side first off the Skid.
Section 3-1 - Overview
LOGIQ™ 7 S
ERVICE
Cap
Plastic Joint
Monitor Sleeve
For LCD
Rear Cushion
Plastic Band
M
ANUAL
3-3

Advertisement

Table of Contents
loading

Table of Contents