System Periodic Maintenance; System Preliminary Checks - GE LOGIQ 7 Service Manual

Hide thumbs Also See for LOGIQ 7:
Table of Contents

Advertisement

GE H
EALTHCARE
D
2286865, R
IRECTION
EVISION
Section 10-5

System Periodic Maintenance

10-5-1
Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-6 System Preliminary Checks
Step
1
Ask & Listen
2
3
4
5
6
14
Item
Ask the customer if they have any problems or questions about the equipment.
Fill in the top of the Periodic Maintenance (PM) Inspection Certificate. Note all probes and system
Paperwork
options.
Turn the system power on and verify that all fans and peripherals turn on. Watch the displays during
Power up
power up to verify that no warning or error messages are displayed.
Probes
Verify that the system properly recognizes all probes.
Displays
Verify proper display on the monitor and touch panel.
Presets
Backup all customer presets on an CD-R.
Section 10-3 - Periodic Maintenance Schedule
LOGIQ™ 7 S
Description
M
ERVICE
ANUAL
10-7

Advertisement

Table of Contents
loading

Table of Contents