Software Loading Work-Flow And Check-List - GE LOGIQ 7 Service Manual

Hide thumbs Also See for LOGIQ 7:
Table of Contents

Advertisement

GE H
EALTHCARE
D
2286865, R
IRECTION
EVISION
8-2-4

Software Loading Work-flow and Check-list

This check sheet is prepared to assist a FE during software loading.
Customer Name
Console #
Section
5-2-2-2
BT09_SV_BEP4
Configuration
Varia-
tionos
8-2-6-1 - Disabling
USB Devices
8-2-6-2 - Save Cus-
tomer Data / Setting
8-2-7 - Install Base
System
8-2-8 - Modify Sys-
tem/Windows
Set-
tings
8-2-9
-
Installing
R8.x.x
Application
Software
8-4
Section 8-2 - Software Loading Procedures for BT09 (R8.x.x or later)
14
Customer Contact
Unit ID
Unit Type
Item
Check current system version before ghost/application
loading
Check if all USB printers are OFF.
Check if SCSI UP-D50 is ON.
Save Customer Setting
Save Customer Setting
Save Customer Setting
Regional Preset
Install Base System
UPS Setting
Drive Letter setting
Hardware Divice
LAN Parameter
TCP/IP Setting
Date/Time Setting
Application CD correctly recognized
LOGIQ™ 7 S
Check Parameter
Should be R8.x.x or later
Should be OFF.
User and Password
Connectivity Parameter
Option Key String
Select fullghost or C ghost
Run UPSSETUP.reg
CD/DVD to be Drive 'G'
Verify
Verify
App loading
M
ERVICE
ANUAL
Result
Ver.
OK
N/A
OK
N/A
OK
N/A
OK
N/A
OK
N/A
Full
C only
OK
NG
OK
NG
OK
NG
OK
NG
OK
NG
OK
NG
OK
NG

Advertisement

Table of Contents
loading

Table of Contents