Electrical Installation
Operating Guide | VACON® NXS/NXP Air-cooled
Procedure
1. Open the cover of the AC drive.
2. Remove the screws of the cable cover. Remove the cable cover. Do not open the cover of the power unit.
3. Locate the terminals.
50 | Danfoss A/S © 2020.02
AQ275638903263en-000301 / DPD00910