Advanced commissioning
6.14 Setpoints
6.14.2

Specifying the setpoint via the fieldbus

Function description
In the quick commissioning, you define the preassignment for the converter interfaces.
Depending on what has been preassigned, after quick commissioning, the receive word
PZD02 can be interconnected with the main setpoint.
Example
Setting with receive word PZD02 as setpoint source:
Parameter
p1070 = 2050[1]
p1075 = 2050[1]
Parameters
Parameter
p1070[0...n]
p1071[0...n]
r1073
p1075[0...n]
p1076[0...n]
202
Description
Interconnects the main setpoint with the receive word PZD02 from the fieldbus.
Interconnects the supplementary setpoint with receive word PZD02 from the
fieldbus.
Description
CI: Main setpoint
CI: Main setpoint scaling
CO: Main setpoint active
CI: Supplementary setpoint
CI: Supplementary setpoint scaling Signal source for scaling the supplementary set-
Setting
Signal source for the main setpoint. The factory
setting depends on the converter.
Converter with PROFINET interface: [0] 2050[1]
Converter without PROFINET interface: [0] 755[0]
Signal source for scaling the main setpoint.
Factory setting: 1
Displays the active main setpoint.
Signal source for the supplementary setpoint.
Factory setting: 0
point. Factory setting: 0
Operating Instructions, 09/2020, FW V4.7 SP13, A5E48681219B
SINAMICS G115D distributed drive