Module Communication Test - Mitsubishi Electric MELSEC iQ-F FX5 Series User Manual

Cc-link ie tsn
Hide thumbs Also See for MELSEC iQ-F FX5 Series:
Table of Contents

Advertisement

Module communication test

The module communication test checks the hardware of the FX5-CCLGN-MS. The module hardware is checked when the
communication using the FX5-CCLGN-MS is unstable.
The following table lists the tests performed.
Test item
Internal self-loopback test
External self-loopback test
Procedure
1.
Set the following setting to "Module Communication Test".
[Navigation window]  [Parameter]  [Module Information]  Target module  [Module Parameter]  [Application
Settings]  [Module Operation Mode]
2.
Connect the P1 and P2 of the FX5-CCLGN-MS with an Ethernet cable.
3.
Write the module parameters to the FX5 CPU module.
4.
Reset or power off and on the FX5 CPU module to start the module communication test.
• Do not execute access to buffer memory during the module communication test. Otherwise, the test may be
completed with an error.
• Do not perform a module communication test while connected to another station. The operation of the other
station may fail. Be sure to use an Ethernet cable to connect together the P1 and P2 of the FX5-CCLGN-MS
on which a module communication test is performed.
Checking on the status and result of the module communication test
The test status and result can be checked with the LED indications of the module.
Test status
Test in progress
Normal completion
Completed with an error
Description
Checks whether the communication function of the module can be performed normally.
Checks whether the communication can be performed normally with the Ethernet cable connected between two
connectors of the module.
RUN LED
Flashing
On
On
ERROR LED
Off
Off
On
10 TROUBLESHOOTING
10.2 Checking the Module Status
10
143

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-f fx5uMelsec iq-f fx5uc

Table of Contents