Perform The Skew Adjustments And Tests - Agilent Technologies 16517A User Reference

4-gsa/s timing and 1-gsa/s synchronous state logic analyzer
Table of Contents

Advertisement

Perform the Skew Adjustments and Tests

Valid skew factors must be present in order to access these tests. The Skew
Tests require valid skew factors to ensure that the tests will pass.
Touch Skew Adjustments and Tests.
1
Perform the skew adjust procedure. Touch Adjust Clock and Data
2
Path Skew. A BNC coax cable (Agilent Technologies 10503A) and
Calibration Pod (16517-63201) are needed. Follow the instructions
on the display. At the end of the Skew adjust, save the skew factors
to NV-RAM. For more information, refer to "To Adjust the
Channel-to-channel Skew" in chapter 10.
Installation and Service
Perform the Skew Adjustments and Tests
13–11

Advertisement

Table of Contents
loading

This manual is also suitable for:

16518a

Table of Contents