Siruba LKS-1900AN Instruction Book page 25

Table of Contents

Advertisement

3. 機頭部支桿的安裝
把機頭部支桿①插到機台孔②裡。
4. 電源開關的安裝、連接
⑴電源開關的安裝
請把電源開關①用木螺絲②固定到機台下
面。請根據使用狀態,用附屬的卡扣③固
定好電纜線。
※ 卡扣③包括固定操作盤電纜用共附屬了 5
個。
3. Installing the head support rod
Drive head support rod ① in hole ② in the
machine table.
4. Installing and connecting the power switch
(1) Installing the power switch
Fix power switch ① under the machine
table with wood screws ② Fix the
cable with staples ③ supplied with the
machine as accessories in accordance
with the forms of use.
※Five staples ③ including the staple for
fixing the operation panel cable are
supplied as accessories.
Introduction
P6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents