Waters ACQUITY UPLC Operator's, Overview And Maintenance Manual page 42

Table of Contents

Advertisement

9.
Carefully route the column-stabilizer-inlet tubing through the groove on
the side of the tray.
10. Insert the Phillips screws into the threaded holes, and tighten them
gently using the Phillips screwdriver.
11. Route the column-stabilizer-inlet tubing through the cutout in the top of
the sample manager door to the injector.
Requirement:
hinge.
12. Remove the O-ring retainer from the inlet end of the column-stabilizer
inlet-tubing, and then connect the inlet tubing to injector port 6 of the
sample manager injector.
38
To avoid stripping the threads, do not overtighten
Caution:
screws.
Do not route the tubing behind the sample manager door
Note: Do not route the tubing
between the sample manager
door and hinge, here.
Column-stabilizer-inlet
tubing

Advertisement

Table of Contents
loading

Table of Contents