Waters ACQUITY UPLC Operator's, Overview And Maintenance Manual page 39

Table of Contents

Advertisement

Required materials
Gloves: clean, powder-free, chemical-resistant
50/100-mm or 150-mm column stabilizer kit:
Collet and compression screw multi-tool (collet separator)
Column stabilizer assembly
PEEK tubing for connecting the column to the detector's flow cell
3 Phillips screws (1 is a spare)
3 thermal gaskets (2 are spares)
Required tools
Needle-nose pliers
Phillips screwdriver
To install the optional column stabilizer assembly:
1.
Stop any currently running mobile phase before replacing the column
stabilizer assembly.
2.
Disconnect the inlet tubing from injector port 6 of the sample manager.
3.
Open the column heater door.
Location of column-
stabilizer-inlet tubing
Preparing the column compartments
35

Advertisement

Table of Contents
loading

Table of Contents