Waters ACQUITY UPLC Operator's, Overview And Maintenance Manual page 29

Table of Contents

Advertisement

b.
Route the 25-pin cable behind the MS-bracket and through the slot
on the right-hand side of the bracket.
c.
Install the TORX screw in the tab, and tighten it slightly.
d.
Hold the left-hand side of the bracket into the slot, and guide the
MS-bracket tab on the right-hand side into the cutout in the sample
manager's chassis.
Ensure that the 25-pin cable remains in the slot as
Requirement:
you guide the tab into the cutout. If the cable slips out of the slot, it
can prevent the bracket from seating fully into the chassis.
e.
Tighten the TORX screw in the tab.
f.
Tighten the 3-mm Allen screw on the left-hand side of the
MS-bracket.
Route the 25-pin cable
through this slot
Preparing the column compartments
Cutout
Tab
25

Advertisement

Table of Contents
loading

Table of Contents