Waters ACQUITY UPLC Operator's, Overview And Maintenance Manual page 125

Table of Contents

Advertisement

6.
Align the leak sensor's T-bar with the slot in the side of the leak sensor
reservoir, and slide the leak sensor into place.
T-bar
Leak sensor
installed in
reservoir
TP02892
Maintaining the column compartments
Slot in leak
sensor reservoir
121

Advertisement

Table of Contents
loading

Table of Contents