Waters ACQUITY UPLC Operator's, Overview And Maintenance Manual page 135

Table of Contents

Advertisement

Warning:
positions at the same time. Doing so can damage the 30-cm column
heater.
4.
Install the new active preheater assembly in the retainer.
If you are replacing the active preheater in a 30-cm column heater:
Install the active preheater in the correct position for your
application.
UPLC column – install the active preheater in the upper
retainer
HPLC column – install the active preheater in the lower
retainer
Install the retainer cover in the unused active preheater position.
5.
Carefully route the active preheater assembly inlet tubing to the valve:
Column heater – route the tubing through the groove on the side of
the column compartment, and then through the cutout in the top of
the sample manager door to the injector. Do not route the tubing
behind the sample manager door hinge.
30-cm column heater – route the tubing through the column heater
door.
Never connect active preheaters in the upper and lower
Maintaining the column compartments
Note: Do not route the tubing
between the sample manager
door and hinge, here.
Active preheater inlet tubing
131

Advertisement

Table of Contents
loading

Table of Contents