Waters ACQUITY UPLC Operator's, Overview And Maintenance Manual page 141

Table of Contents

Advertisement

Stop any currently running mobile phase before replacing the
Requirement:
frit in the in-line filter unit.
Required materials
Gloves: clean, powder-free, chemical-resistant
Replacement frit
Required tools
5/16-inch open-end wrench (2)
To replace the frit in the in-line filter unit:
1.
After allowing sufficient time for cooling, open the column heater,
column manager, or auxiliary column manager door.
2.
Remove the column components (column, in-line filter unit, and active
preheater or stabilizer tubing assembly).
Column components:
Column
3.
Detach the active preheater or column stabilizer tubing assembly from
the column in-line filter unit.
Requirement:
Flow
In-line filter unit
Do not detach the in-line filter unit from the column inlet.
Maintaining the column compartments
Active preheater or column
stabilizer tubing assembly
Inlet
Reusable fitting
TP02873
137

Advertisement

Table of Contents
loading

Table of Contents