Waters ACQUITY UPLC Operator's, Overview And Maintenance Manual page 23

Table of Contents

Advertisement

To prevent burn injuries, set the column temperature to Off,
Warning:
and then allow the column compartment and its components to cool for
60 minutes before touching them. Monitor the column compartment
internal temperature to ensure all components are cool.
To prevent contaminating system components, wear clean,
Caution:
chemical-resistant, powder-free gloves when preparing the column
heater for use with a mass spectrometer.
To install the MS-bracket:
1.
Stop any currently running mobile phase.
2.
Power-off the sample manager.
3.
Using the 1/4-inch open-end wrench, disconnect the column inlet, active
preheater, or column stabilizer tubing from injector port 6 of the sample
manager.
4.
Disconnect the column-outlet PEEK
5.
Open the column heater door, and remove the column.
Column, active preheater, or
column-stabilizer-inlet tubing
®
tubing from the detector inlet.
Preparing the column compartments
19

Advertisement

Table of Contents
loading

Table of Contents