Preparing The Instrument For Working On The Source - Waters Xevo TQ-S Operator's, Overview And Maintenance Manual

Ivd mass spectrometry system
Table of Contents

Advertisement

Preparing the instrument for working on the source

For safety reasons, you must follow this procedure before working on the
source (for example, when changing the probe, operating the source isolation
valve, and when maintaining the source).
To prepare the instrument for working on the source:
1.
In the Instrument Console, click Stop Flow
column flow is required, divert the LC flow to waste as follows:
a.
In the Instrument Console system tree, expand Xevo TQ-S Detector,
Interactive Fluidics.
b.
Click Control
c.
Select Waste as the flow state.
2.
In the Instrument Console, click Standby
Operate indicator is not illuminated.
3.
Wait 3 minutes to allow the desolvation gas flow to cool the probe and
source.
4.
In the Instrument Console, click API
flow.
4-6
Maintenance Procedures
.
to stop the LC flow, or if
, and confirm that the
to stop the desolvation gas

Advertisement

Table of Contents
loading

Table of Contents