Preparing The Mass Spectrometer For Operation With The Apgc; Preparing The Instrument For Work Performed On Its Source - Waters APGC Operator's Manual Supplement

Atmospheric pressure gas chromatography
Table of Contents

Advertisement

Preparing the mass spectrometer for operation with the
APGC
For additional information, see the mass spectrometer's operator's overview
and maintenance guide.

Preparing the instrument for work performed on its source

Follow the relevant procedure for your instrument before working on the
source: for example, when installing or removing the corona pin or ion
chamber, operating the source isolation valve, or maintaining the source.
To prepare the Xevo TQ MS, Xevo TQ-S, Xevo TQD, or SQ Detector 2:
1.
In the MassLynx™ Tune window, click Standby
2.
Set the source temperature to 30 °C.
3.
Wait 30 minutes, to allow the source to cool.
4.
In the Tune window, click API
To prepare the Xevo QTof MS, Xevo G2 QTof, Xevo G2 Tof, or SYNAPT G2
MS/HDMS:
1.
In the Tune window, click Source Standby
2.
Set the source temperature to 30 °C.
3.
Wait 30 minutes, to allow the source to cool.
The API gas flow stops automatically when you click Source
Note:
Standby.
See also:
maintenance guide.
2-2
Setting up the APGC
The relevant instrument's operator's overview and
, to stop the API gas flow.
.
.

Advertisement

Table of Contents
loading

Table of Contents