FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Step 10 Install the server node.
For details, see
Step 11 Power on the server node.
For details, see
Step 12 Configure the RAID controller card.
For details, see
----End
8.4.5 Removing the Supercapacitor
Procedure
Step 1 Power off the server node.
For details, see
Step 2 Remove the server node.
For details, see
Step 3 Place the server node on the ESD workstation.
Step 4 Determine the position of the supercapacitor.
Step 5 Remove the air duct for the supercapacitor.
Step 6 Remove the supercapacitor holder.
1.
2.
3.
Figure 8-20 Removing the supercapacitor holder
Issue 07 (2019-12-20)
8.3.4 Installing an XH321
8.3.1 Power-On
Huawei V5 Server RAID Controller Card User
8.3.2 Power-Off
8.3.3 Removing an XH321
Loosen the screws on the server node panel. See (1) in
Remove the panel. See (2) in
Loosen the screws that secure the supercapacitor holder and remove the
supercapacitor holder. See (3) in
Copyright © Huawei Technologies Co., Ltd.
V5.
Procedure.
Procedure.
V5.
Figure
8-20.
Figure
8-20.
8 Parts Replacement
Guide.
Figure
8-20.
58