FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
1.
2.
Figure 8-11 Connecting a multi-port cable
Step 5 Install optical modules and optical cable as required.
Replacing the optical cable, network cable, or optical module will interrupt
services.
1.
2.
Step 6 Power on the server node.
For details, see
Step 7 Check indicator status.
For details, see
----End
8.4 Field Replaceable Units
Issue 07 (2019-12-20)
Press the two tabs on the multi-port cable connector. See (1) in
Connect the multi-port cable to the UCP on the server. See (2) in
NO TICE
Close the security pin on the optical module, use die-casting pliers to clamp
the optical module, and insert it into the optical port until you hear a click.
Use die-casting pliers to clamp the optical connector, and insert it into the
optical port of an optical module until you hear a click.
8.3.1 Power-On
2.1.2 Indicators and
Copyright © Huawei Technologies Co., Ltd.
Procedure.
Buttons.
8 Parts Replacement
Figure
8-11.
Figure
8-11.
50