Installing The Battery - Huawei FusionServer Pro XH321 V5 V100R005 Maintenance And Service Manual

Server node
Hide thumbs Also See for FusionServer Pro XH321 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Figure 8-54 Removing the battery
Step 7 Place the removed component in an ESD bag.
----End

8.4.18 Installing the Battery

Procedure
Step 1 Power off the server node.
For details, see
Step 2 Remove the server node.
For details, see
Step 3 Place the server node on the ESD workstation.
Step 4 Take the spare part out of its ESD bag.
Step 5 Determine the position of the battery.
Figure 8-55 Position of the battery
Issue 07 (2019-12-20)
8.3.2 Power-Off
8.3.3 Removing an XH321
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
8 Parts Replacement
87

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionserver pro xh321 v5V100r005

Table of Contents