Figure 8-22 Removing the supercapacitor
Step 11 Place the removed component in an ESD bag.
----End

8.4.6 Installing the Supercapacitor

Procedure
Step 1 Power off the server node.
For details, see
Step 2 Remove the server node.
For details, see
Step 3 Place the server node on the ESD workstation.
Step 4 Take the spare part out of its ESD bag.
Step 5 Determine the position of the supercapacitor.
Step 6 Vertically insert the supercapacitor into the holder until the supercapacitor is
locked.
Figure 8-23 Installing the supercapacitor
Step 7 Check whether the supercapacitor is configured with a TFM.
Issue 07 (2019-12-20)
8.3.2 Power-Off
8.3.3 Removing an XH321
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
8 Parts Replacement
60

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionserver pro xh321 v5V100r005

Table of Contents