FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
2.
Step 10 Install the PCIe card.
For details, see
Step 11 Install the air duct.
For details, see
Step 12 Install the server node.
For details, see
Step 13 Power on the server node.
For details, see
Step 14 Enable TPM.
1.
2.
3.
4.
5.
6.
7.
Issue 07 (2019-12-20)
Figure 8-52 Installing a TPM
Connect the cables to the TPM.
For details, see
7.1 TPM
8.4.20 Installing a PCIe
8.4.24 Installing the Air
8.3.4 Installing an XH321
8.3.1 Power-On
Access the BIOS interface.
For details, see
Huawei Server Purley Platform BIOS Parameter
Select Security.
Select TPM Operation and press Enter.
Select Enable.
Press F10.
The system displays "Exit Saving changes?" dialog box is displayed.
Select Yes.
The settings are saved.
Restart the server.
Copyright © Huawei Technologies Co., Ltd.
Cabling.
Card.
Duct.
V5.
Procedure.
8 Parts Replacement
Reference.
85