FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Step 9 Remove the supercapacitor if there is any.
For details, see
Step 10 Remove the screw-in RAID controller card.
For details, see
Step 11 Remove the PCIe riser modules.
For details, see
Step 12 Remove the TPM.
For details, see
Step 13 Remove memory modules.
For details, see
Step 14 Remove processors.
For details, see
Step 15 Remove all cables from the mainboard.
For details, see
Step 16 Place the removed server node case (with the mainboard) and components in
different ESD bags.
----End
8.4.26 Installing the Mainboard and Server Node Case
Procedure
Step 1 Take the spare part out of its ESD bag.
Step 2 Place the server node on the ESD workstation.
Step 3 Determine the position of the mainboard and the server node case.
Issue 07 (2019-12-20)
8.4.5 Removing the
8.4.3 Removing the Screw-in RAID Controller
8.4.21 Removing the PCIe Riser
8.4.15 Removing the
8.4.13 Removing a Memory
8.4.11 Removing a
7 Internal
Before placing the mainboard and the server node case into an ESD bag, ensure that the
processor sockets are installed with covers.
Copyright © Huawei Technologies Co., Ltd.
Supercapacitor.
TPM.
Module.
Processor.
Cabling.
8 Parts Replacement
Card.
Module.
100