Figure 8-68 Mainboard and server node case
Step 4 Connect all the cables to the mainboard.
For details, see
Step 5 Install processors.
For details, see
Step 6 Install memory modules.
For details, see
Step 7 Install the TPM.
For details, see
Step 8 Install the PCIe riser modules.
For details, see
Step 9 Install the screw-in RAID controller card.
For details, see
Step 10 Install the supercapacitor if it is configured.
For details, see
Step 11 Install the air duct.
For details, see
Step 12 Install the server node.
For details, see
Step 13 Power on the server node.
For details, see
Issue 07 (2019-12-20)
7 Internal
Cabling.
8.4.12 Installing a
8.4.14 Installing a Memory
8.4.16 Installing the
8.4.22 Installing the PCIe Riser
8.4.4 Installing the Screw-in RAID Controller
8.4.6 Installing the
8.4.24 Installing the Air
8.3.4 Installing an XH321
8.3.1 Power-On
Procedure.
Copyright © Huawei Technologies Co., Ltd.
Processor.
Module.
TPM.
Module.
Supercapacitor.
Duct.
V5.
8 Parts Replacement
Card.
101

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionserver pro xh321 v5V100r005

Table of Contents