Huawei FusionServer Pro XH321 V5 V100R005 Maintenance And Service Manual page 63

Server node
Hide thumbs Also See for FusionServer Pro XH321 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Step 3 Place the server node on the ESD workstation.
Step 4 Determine the position of the screw-in RAID controller card.
Figure 8-16 Position of the screw-in RAID controller card
Step 5 Check whether a supercapacitor is configured.
Step 6 Remove the supercapacitor.
For details, see
Step 7 Remove the cable from the RAID controller card.
For details, see
Step 8 Remove the RAID controller card.
1.
2.
Issue 07 (2019-12-20)
If yes, go to
Step
6.
If no, go to
Step
7.
8.4.5 Removing the
7 Internal
Loosen the screws that secure the RAID controller card. See (1) in
8-17.
Remove the RAID controller card from the connector on the mainboard. See
(2) in
Figure
8-17.
Copyright © Huawei Technologies Co., Ltd.
Supercapacitor.
Cabling.
8 Parts Replacement
Figure
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionserver pro xh321 v5V100r005

Table of Contents