FusionServer Pro XH321 V5 Server Node
Maintenance and Service Guide
Figure 8-17 Removing the screw-in RAID controller card
Step 9 Place the removed component in an ESD bag.
----End
8.4.4 Installing the Screw-in RAID Controller Card
Procedure
Step 1 Power off the server node.
For details, see
Step 2 Remove the server node.
For details, see
Step 3 Place the server node on the ESD workstation.
Step 4 Take the spare part out of its ESD bag.
Step 5 Check whether a supercapacitor is configured.
●
●
Step 6 Install the supercapacitor.
For details, see
Step 7 Determine the position of the screw-in RAID controller card.
Issue 07 (2019-12-20)
8.3.2 Power-Off
8.3.3 Removing an XH321
If yes, go to
Step
6.
If no, go to
Step
7.
8.4.6 Installing the
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
Supercapacitor.
8 Parts Replacement
56